Latest News · (Taipei)
Tamsui Bridge Motorcycle Lane Closed for Three Hours for Expansion Joint Cleaning
On November 24, 2026, the Department of Highway North Branch Jingmei Section initiated an urgent, three-hour closure of the motorcycle lane on Tamsui Bridge starting at 9 AM, following the discovery of accumulated debris and soil within the bridge's expansion joints.
This necessary measure aims to preserve the proper function of the expansion joints and prevent slippery conditions for motorcyclists caused by rainwater accumulation, with the cleaning operation concluding at noon.
For the safety of both users and construction staff, the department utilized a rotating method, closing each joint briefly for cleaning before immediately reopening it. Nevertheless, commuters reported that no temporary lane was designated on the car fast lane for motorcycles, and the pedestrian walkway remained inaccessible, leading to waiting times at the closure point.
The Department of Highway North Branch Jingmei Section expressed regret for the delays and inconvenience experienced by travelers, confirming that general maintenance tasks will henceforth be shifted to nighttime hours to minimize daytime traffic disruption.
Original reports
This article is an independent rewrite by Taiwan INFO based on the reports below. Facts, figures and names follow the original sources; for full details, please read the originals.
- 中央社: 淡江大橋清理伸縮縫急封機車道3小時 公路局致歉 11/24 16:58
- 自由時報: 淡江大橋機車道突封閉3小時挨轟 公路局致歉:伸縮縫土砂清理 11/24 16:21